Wandong soil testing

From July to August 2023, specialist contractors will conduct soil testing in various locations to inform the design of the Broadford-Wandong Road bridge replacement.

Snapshot

Date

July 2023 - August 2023

Working hours

7am – 6pm weekdays

Location

Broadford-Wandong Road, Rail Street and Epping-Kilmore Road

Town
  • Wandong
Local Government Area
  • Mitchell Shire Council

Work being done

Testing will occur in both the rail corridor and within the road reserve on Broadford-Wandong Road, Rail Street and Epping-Kilmore Road.

Depending on the depth required and access to the site either a mobile drill rig towed by a car or a two-person crew with hand augers will be used to bore small holes in the ground (about 5-10cm diameter) and collect samples.

Prior to works starting, the ground will be scanned to locate any unknown underground services. If services are located, contractors will conduct non-destructive water bore drilling to locate services and map the site.

Residents and motorists are asked to take care and observe all traffic management instructions and signage.

What can I expect?

  • Increased activity in the rail corridor
  • Traffic management and signage around work sites located in the road reserve
  • Reduced road speeds near the works in the road reserve
  • Mobile machinery and equipment operating onsite and accessing the rail corridor via nearby local roads and reserves
  • Nearby residents can expect some bore hole drilling noise during daylight hours
  • The drilling process will create small holes in the ground which will be filled in at the completion of the works.

Machinery used

  • small drill rig or hand auger,
  • support vehicles,
  • traffic management equipment and
  • signage.

How we’re managing impacts

  • works will occur in daylight hours
  • traffic management will be in place to ensure safe access for all road users
  • mobile drilling equipment will ensure property access can be maintained upon request.

Contact

Thank you for your patience and cooperation while we carry out these works.

Phone: 1800 732 761

Email: victoriaprojects@artc.com.au

Post: 39 Bakehouse Road, Kensington VIC 3031

Soil sampling sites, Wandong

Map showing the soil sampling sites in Wandong


Share: