Yallaroi Creek rail bridge replacement
Trans4m Rail will conduct rail bridge demolition and replacement works near Yallaroi Creek and Boonery Park Road, south of North Star, between April and September 2021.
Work being done
The works will involve construction of temporary road access from Boonery Park Road to the bridge. Demolition will include removal of the existing bridge structure and concrete components. The bridge replacement will commence following demolition.
A temporary access road, west of level crossing 921 near Boonery Park Road, will be used to access the site during these works.
What to expect
- Trucks and other vehicles will enter and exit the construction site via Boonery Park Road, west of level crossing 921
- Construction machinery and equipment operating on site
- Delivery of materials and equipment
- Motorists should follow traffic controls and drive with caution
- There may be some noise associated with these works
Machinery used
Trucks, cranes, graders, excavators, loaders, rollers and water / vacuum excavation trucks will be used within the construction impact zone.
How we’re managing impacts
- Traffic control will be in place, where required.
- Water carts will be on site to wet down areas to assist in managing dust.
Contact
Phone: 1800 732 761
Email: inlandrailnsw@artc.com.au
Post: Inland Rail, GPO Box 14, Sydney NSW 2001