No. 70: Brolgan Road, Parkes

As part of our work to build Inland Rail, we're upgrading the level crossing at Brolgan Road, Parkes.

No. 70: Brolgan Road, Parkes

Snapshot

Date

July 2025

Local Government Area

To allow traffic to continue to use Brolgan Road, we will be implementing traffic control to maintain single-lane access.

A speed reduction to 40km/h will be in place several hundred meters on either side of the current level crossing on Brolgan Road for safety of all road users, until the work is completed.

Traffic control devices will be on either end of the work to manage traffic.

Changed traffic conditions will be in place until late February 2020.

Location of works

Brolgan Road, Parkes

What we’re doing

  • Laying new rail and sleepers
  • Build road formations and new plate over rail
  • Welding rail into place
  • Install new gravel (ballast), tamp (adjust) rail into place
  • Install permanent signage and fencing

What to expect

  • During the work there will be heavy vehicles travelling to and from the work sites.
  • Traffic management with detour signage will be in place to assist those impacted by the road closure.

Share: