Track realignment works (out-of-hours works), Bribbaree, March 2024

Inland Rail will undertake track alignment works within the existing rail corridor northwest of Bribbaree Road, Bribbaree during a statewide track possession starting from 6am Saturday, 9 March until 10pm Tuesday, 12 March 2024. These works may be continuous, including night works during this period.

Snapshot

Date

09 March 2024 - 12 March 2024

Working hours

Continuous work: 6am 9 March to 10pm 12 March 2024.

Location

Bribbaree Road

Town
  • Bribbaree
Local Government Area
  • Hilltops Council

Work being done

  • Delivery rail tamping machine and regulator
  • Track realignment
  • Track testing

The work is targeted at realigning the track to facilitate future freight train movements (see map below for site details).

Track realignment works will occur during a scheduled ARTC track closure, when trains are not running. This is to ensure the safety of construction personnel.

What can I expect?

Deliveries of material and equipment to site will occur from 4 to 8 March 2024 during normal construction hours of 7am to 6pm Monday to Friday and 8am to 1pm on Saturdays.

Before and during the works, heavy vehicle movements will increase from Bribbaree Road, into Wirrup Road and into the rail yard. Motorists and pedestrians are asked to please use caution when driving or walking in the area.

  • Heavy vehicles will commence delivering equipment to site.
  • Rail track machinery and construction equipment operating on site during the hours noted above.
  • At times our construction work may create high levels of noise particularly when carrying out activities such as the delivering of equipment and materials to the compound area via trucks.
  • We will undertake high noise impact activities such as rail tamper and regulator during daytime hours.
  • Use of non-tonal reversing alarms on all equipment and turning off equipment when not in use.
  • Regular maintenance of plant and equipment to reduce emissions.
  • Instructing workers to keep noise to a minimum and being respectful of our neighbours.

Machinery used

Equipment used for work includes but is not limited to rail tamping machines and regulators, heavy and light vehicles.

How we’re managing impacts

  • Traffic controls will be in place, where required.
  • Water carts will be on-site to wet down areas to assist in managing dust, where required.
  • Works programmed to best minimise noise impacts. We will aim to minimise noise from the works.

Unfortunately, some construction activities are inherently noisy which cannot be avoided. Properties near the construction site can expect to hear:

  • movements of heavy vehicles
  • loading, unloading or moving equipment and construction materials
  • Works will be monitored to ensure compliance with Project Approval Conditions.

Contact

Please contact the community team if you have any questions about the project.

Complaints and enquiries about the works may also be made to the number or email address below.

We will continue to keep you updated on the progress of work in your area.

Phone: 1800 732 761

Email: inlandrailnsw@artc.com.au

Thank you for your patience and cooperation while we carry out these works.

 