Quandialla and Milvale construction works, 8-30 October 2024

Inland Rail will undertake modifications to the water tanks at both Quandialla and Milvale from 8 to 30 October.

Map of work area in Quandialla during October 2024.

Snapshot

Date

08 October 2024 - 30 October 2024

Working hours
  • 7am-6pm Monday to Friday
Location

Area around the water tanks

Town
  • Milvale
  • Quandialla
Local Government Area
  • Weddin Shire Council
  • Hilltops Council

Work being done

Construction will occur between 7AM and 6PM, Monday to Friday.

Works will include:

  • Water tower modifications
  • Removal of steel pipe and wire from the water tower

Works area

To safely complete this work, the following roads will be managed by traffic control and therefore will remain open under the guidance of stop & go system:

  • Milvale Road
  • Bland Road
  • First Street
  • Bimbi-Quandialla Road

Construction updates will be provided to our neighbours as these works progress.

Quandialla

Map of work area in Quandialla during October 2024.

Milvale

Vehicle movements

During the works, vehicle movements will be to and from site as well as on site to facilitate modifications.

Traffic controllers will be available to direct traffic to and from site where needed.

What can I expect

  • Heavy vehicle movements
  • Some of these works will be noisy. You may hear truck engines and engine noise from machines.

Machinery used

Equipment used for work includes but is not limited to light vehicles, heavy vehicles, elevated work platforms and hand tools.

How we're managing impacts

To minimise noise impacts to you during these works the following measures will be undertaken:

  • Respite periods will apply to noisy works (e.g. noisy equipment such as saw cutting will be undertaken in block of no more than 3 hours with at least 1 hour of respite between each block of work)
  • Adhering to the compliance conditions as defined in the Environment Protection Licence (EPL)
  • Orientating equipment away from noise-sensitive receivers where possible
  • No unnecessary shouting or loud stereos/radios on site
  • Communication between workers and plant operators using UHF radios and hand signals
  • Where practicable, substitution using alternative low noise plant and equipment
  • When applicable, implement mitigation measures to address noise disturbances
  • All vehicles to be switched off when not in use.

Contact

Thank you for your patience and cooperation while we carry out these works.

Phone: 1800 732 761

Email: inlandrailnsw@inlandrail.com.au


Share: