Boonery Park Road level crossing upgrade

Our contractor Trans4m Rail will undertake level crossing and drainage upgrade works on Boonery Park Road, north of Croppa Creek, from Friday 7 January 2022.

Snapshot

Date

07 January 2022 - March 2022

Working hours

7am to 6pm, seven days a week

Location

Level crossing 921 on Boonery Park Road, north of Croppa Creek

Town
  • Croppa Creek
Local Government Area
  • Moree Plains Shire

Work being done

Works will include installing new drainage structures and upgrades at level crossing 921.

To facilitate the works, a temporary gravel access road will be constructed to divert traffic, including road trains, around the existing level crossing.

Motorists are urged to follow changing traffic conditions on site, including speed zone reductions and directional traffic signage.

What can I expect

  • Trucks and other vehicles entering and exiting the construction site
  • Construction machinery and equipment operating on site adjacent to live traffic along Boonery Park Road
  • Delivery of materials and equipment to site
  • Some of these works will be noisy and mitigation measures will be in place
  • Some minor traffic delays are expected during work hours.

Machinery used

  • Trucks
  • cranes
  • graders
  • excavators
  • loaders
  • rollers
  • water/vacuum excavation trucks.

How we’re managing impacts

  • Traffic controls will be in place, where required
  • Water carts will be on site to wet down areas to assist in managing dust.

Contact

Phone: 1800 732 761

Email: inlandrailnsw@artc.com.au

Post: Inland Rail, GPO Box 14, Sydney NSW 2001

Map

Boonery Park Road level crossing upgrade (construction impact zone shown in red).

Map showing level crossing works at Boonery Park Road NSW 2411


Share: