Tarlee Road, Edgeroi Level Crossing upgrade

Between June to October 2022, our contractor Trans4m Rail will continue major level crossing works on Tarlee Road, Edgeroi.

Snapshot

Date

June 2022 - October 2022

Working hours

7am to 6pm, seven days a week

Location

Tarlee Road level crossing 543

Town
  • Edgeroi
Local Government Area
  • Narrabri Shire

Work being done

Works will include upgrades, including pavement installation to level crossing 543.

To facilitate the works, a temporary road has been constructed to divert traffic around the existing level crossing. The temporary gravel access road will accommodate road trains.

To allow for pavement works on both sides of Tarlee Road a traffic lane switch will occur midway throughout the works to provide a safe work zone during construction.

What is a traffic switch?

Diverting traffic onto a different section of road is referred to as a traffic switch. Switching traffic helps us minimise disruption caused by construction works.

Motorists are urged to follow changing traffic conditions on site, including speed zone reductions and directional signage.

What can I expect

  • Trucks and other vehicles entering and exiting the construction site
  • Construction machinery and equipment operating on site adjacent to live traffic
  • Delivery of materials and equipment
  • Some of these works will be noisy and mitigation measures will be in place
  • Some minor traffic delays are expected during work hours.

Machinery used

  • Trucks,
  • cranes,
  • graders,
  • excavators,
  • loaders,
  • rollers and
  • water/vacuum excavation trucks

will be used within the construction impact zone.

How we’re managing impacts

  • Traffic control will be in place, where required
  • Water carts will be on site to wet down areas to assist in managing dust.

Contact

Phone: 1800 732 761

Email: inlandrailnsw@artc.com.au

Post: Inland Rail, GPO Box 14, Sydney NSW 2001


Share: