Flood Design Verification Report for Phase 1

Technical and Approvals Consultancy Services: Narrabri to North Star Flood Design Verification Report for Phase 1

This report has been prepared in response to the Conditions of Approval (CoA) issued by the NSW Department of Planning and Environment (DPE) for N2NS Phase 1. The report assesses flood behaviour within the local catchments crossed by the project, within the Namoi, Gwydir and Macintyre River basins.

Updated: September 7, 2021


Download

File size: 4.72Mb

Please contact us if any content within this document is inaccessible. If you need help with reading this document, or if English is your second language, please call 131 450. This is a free service.