Gil Gil Creek Road roadworks
Our contractor Trans4m Rail will undertake roadworks on Gil Gil Creek Road (between County Boundary Road and Oregon Road) from Friday 7 January 2022.
Work being done
Works will occur between 7am and 6pm Monday to Sunday (intermittently) and be completed under traffic control.
Changed traffic conditions
Traffic flows will be managed using a one lane alternate flow system where one lane is always open to traffic. Minor delays are expected.
Motorists are urged to follow all speed zone reductions and directional traffic signage.
What can I expect
- Trucks and other vehicles entering and exiting the construction site
- Construction machinery and equipment operating on site
- Timing of works will be intermittent.
Machinery used
- Trucks
- graders
- rollers
- water trucks.
How we’re managing impacts
- Traffic controls will be in place, including Variable Message Signage (VMS) directing traffic to the road detour
- Some of these works will be noisy and mitigation measures will be in place
- Water carts will be on site to wet down areas to assist in managing dust.
Please note works are dependent on weather conditions and are subject to change.
Contact
Phone: 1800 732 761
Email: inlandrailnsw@artc.com.au
Post: Inland Rail, GPO Box 14, Sydney NSW 2001