Milguy ongoing construction and drainage works
Trans4m Rail will continue works in the Milguy area near Country Boundary Road and Alma Lane from May to October 2021. This will include developing the material laydown area and ongoing drainage replacement works.
What to expect
- Trucks and other vehicles will enter and exit the construction site from County Boundary Road and Alma Lane
- Construction machinery and equipment operating onsite
- Ongoing delivery of materials and equipment
- Low impact activities, such as machinery re-fuelling, managing environmental controls and traffic control may occur outside of listed works hours
- Motorists should follow traffic controls and drive with caution
- There may be some noise associated with these works.
Machinery used
Trucks, graders, scrapers, excavators, loaders, rollers and water / vacuum excavation trucks will be used as part of these works.
How we’re managing impacts
- Traffic control will be in place, where required
- Water carts will be on site to wet down areas to assist in managing dust.
Contact
Phone: 1800 732 761
Email: inlandrailnsw@artc.com.au
Post: Inland Rail, GPO Box 14, Sydney NSW 2001