Track formation trials in Milguy

Trans4m Rail will conduct track formation trials in Milguy between March and April 2021. This 1km trial will provide essential data to progress the detailed design of the track formation. Works will involve removing the current track foundation and replacing it with lime stabilised fill.

Map of works at Milguy in March and April 2021

Snapshot

Date

March 2021 - April 2021

Working hours

Between 7am and 6pm, Monday to Saturday

Location

Level crossing 3159, near Alma Lane, Milguy

Town
  • Milguy, NSW
Local Government Area
  • Moree Plains Shire Council

What to expect

  • trucks and other vehicles will enter and exit the construction site via Alma Lane
  • construction machinery and equipment operating on site
  • delivery of materials and equipment
  • motorists should follow traffic controls and drive with caution
  • there may be some noise associated with these works

Machinery used

Hi-rail vehicles, trucks, graders, scrapers, excavators, loaders, stabilisers, rollers and water/vacuum excavation trucks will be used within the construction impact zone.

How we’re managing impacts

  • Traffic control will be in place, where required.
  • Water carts will be on site wetting down areas to manage dust.

Contact

Phone: 1800 732 761

Email: inlandrailnsw@artc.com.au

Post: Inland Rail, GPO Box 14, Sydney NSW 2001


Share: