Buckie Road, Croppa Creek Level Crossing upgrade
From January to March 2023, our contractor Trans4m Rail will continue level crossing and drainage upgrade works on Buckie Road, in Croppa Creek town centre.
Work being done
- Road pavement works
- Drainage installation
- Level crossing street lighting installation including power pole and conductor install
- Construction of pedestrian crossing
- Footpath installation
- Signage installation
- Sealing and line marking.
What can I expect
- Trucks and other vehicles entering and exiting the construction site
- Construction machinery and equipment operating on site adjacent to live traffic
- Delivery of materials and equipment
- Some of these works will be noisy and mitigation measures will be in place
- Some minor traffic delays are expected during work hours.
Machinery used
- Trucks,
- cranes,
- graders,
- excavators,
- loaders,
- rollers and
- water/vacuum excavation trucks
will be used within the construction impact zone.
How we’re managing impacts
- Traffic control will be in place, where required
- Water carts will be on site to wet down areas to assist in managing dust.