I B Bore Road, North Star Level Crossing upgrade
From November 2022, our contractor Trans4m Rail will continue level crossing upgrade works on I B Bore Road, North Star.
Work being done
Works will include, pavement works, sealing, line marking, rail and panel installation and upgrades to level crossing 923.
What can I expect
- Trucks and other vehicles entering and exiting the construction site
- Construction machinery and equipment operating on site adjacent to live traffic
- Delivery of materials and equipment
- Some of these works will be noisy and mitigation measures will be in place
- Some minor traffic delays are expected during work hours.
Machinery used
- Trucks,
- cranes,
- graders,
- excavators,
- loaders,
- rollers and
- water/vacuum excavation trucks
will be used within the construction impact zone.
How we’re managing impacts
- Traffic control will be in place, where required
- Water carts will be on site to wet down areas to assist in managing dust.
Contact
Phone: 1800 732 761
Email: inlandrailnsw@artc.com.au
Post: Inland Rail, GPO Box 14, Sydney NSW 2001