Temporary site establishment Avenel Road, Seymour 26 August – late-September 2024

Specialist contractors will undertake site surveys and investigation works at various locations within the rail corridor between Seymour-Avenel Road and the Hume Freeway, Seymour.

Snapshot

Date

21 August 2024 - September 2024

Working hours
  • 7am-6pm Monday to Friday
  • 7am-1pm Saturdays

24-hour works within the rail corridor from:

  • 10pm Friday, 30 August to 4am Monday, 2
    September
  • 6am Saturday, 14 September to 6pm Monday, 16
    September
Location

Various locations within the rail corridor

Town
  • Seymour
Local Government Area
  • Mitchell Shire Council

Work being done

Specialist contractors will undertake site surveys and investigation works at various locations within the rail corridor between Seymour-Avenel Road and the Hume Freeway, Seymour.

Temporary site establishment

To facilitate the works within the rail corridor between Seymour-Avenel Road and the Hume Freeway, Seymour we will be:

  • Establishing a temporary site on vacant land off Avenel Road, Seymour
  • Workers will enter and exit the rail corridor via a level crossing on Tarcombe Road.

Other activities will include:

  • Surveying the Hume Freeway bridge and the railway track at multiple locations within the rail corridor
  • Locating and mapping underground services using non-destructive digging (NDD)
  • Borehole drilling using a small truck mounted drill rig to take soil samples for testing and assessment. Once the works are complete at each location the hole will be filled.

During this time pedestrians and drivers are asked to take care and observe all traffic management instructions and signage.

Works area

Map of works area showing an area near the Hume Freeway at Seymour

What can I expect?

  • Works 7am-6pm Monday to Friday and 7am-1pm Saturdays
  • Round-the-clock works within the rail corridor from:
    • 10pm Friday 30 August to 4am Monday 2 September
    • 6am Saturday 14 September to 6pm Monday 16 September
  • Traffic management will be in place at the Tarcombe Road level crossing to facilitate vehicle and pedestrian movement. Please observe all traffic management instructions and signage
  • Reduced speed limits of 40km/h near works
  • Workers using machinery, equipment, hand tools and service vehicles operating at each site
  • Nearby residents may hear some noise during this time and can expect some additional construction workers and vehicles in the area.

Cancellation of works

Works can sometimes be cancelled at short notice depending on weather and other factors. Should this occur, works will be rescheduled.

Machinery used

Small truck mounted drill rig, elevated work platform, NDD truck, support vehicles, workers using hand tools and survey equipment, traffic management equipment and
signage.

How we're managing impacts

  • Traffic management and reduced road speeds
  • Environmental controls in place
  • Access to private properties will be maintained.

Contact

For any concerns or enquiries phone 1800 732 761 or email inlandrailvic@inlandrail.com.au.

Thank you for your patience and cooperation while we carry out these works.


Share: