As part of building Inland Rail, we are upgrading level crossings between Parkes and Narromine. This requires temporary road closures from time to time.
We are upgrading the level crossing at Bogan Road, Goonumbla. To allow traffic to continue to use Bogan Road, we will be building a single lane side road. The side road will be in use until the crossing upgrade is finished.
Timing and location of works
Bogan Road, Goonumbla.
What we’re doing
- The side road will be constructed on the southern side of Bogan Road from early October 2019.
- Traffic will be detoured onto the side road until Bogan Road level crossing is upgraded.
- Traffic controls will be on either end of the side road to manage the two-way traffic on the single lane side road.
- Following the level crossing upgrade, traffic will be returned to Bogan Road.
What to expect
- A speed reduction to 60km/h will be in place several hundred meters on either side of the level crossing on Bogan Road for safety of all road users.
- Traffic control will manage two-way traffic on the single lane side road.
- During the work there will be heavy vehicles travelling to and from the work sites.
- Traffic management with detour signage will be in place to assist those impacted by the road closure.