Works notifications and environmental investigations


Inland Rail’s Narrabri to North Star section is part of the 1,600km fast freight rail line that will connect Melbourne to Brisbane.

Narrabri to North Star crosses the three local government areas of Gwydir, Narrabri and Moree Plains. Due to its scale and complexity, the Narrabri to North Star section was broken into two stages to ensure construction could start while planning and design is finalised on the more complex segments.

To help us plan, design and construct Inland Rail, we complete extensive field studies and site investigations to understand relevant environmental features, technical challenges and opportunities. This also ensures our regulatory requirements are met by minimising and adequately mitigating impacts to the environment.

Our work is not possible without the continued support and proactive collaboration from alignment landowners. We appreciate and value their commitment to progressing Inland Rail.

Environmental investigations include:

  • geotechnical and ecological surveys – to gather information about soil, ecological habitats and communities
  • hydrology studies – to examine historical and predicted flooding and surface water movements
  • noise, air quality and vibration surveys – to measure current levels at key project sites and assess the operational levels across the entire alignment
  • surface water and groundwater baseline studies
  • utility identification surveys – to identify infrastructure such as electrical, gas and water pipelines
  • traffic surveys – to establish existing vehicle class, movements and volumes on local roads and highways
  • land and heritage surveys – to identify property boundaries and investigate any evidence of Aboriginal and non-Aboriginal artefacts and heritage.
A rural field with a railway line on a raised platform. A work site has been set up beside it, with machinery and people digging the earth.

Narrabri to North Star works notifications


Below is a list of the works notifications for the Narrabri to North Star section of Inland Rail.

TownWorksLocationTimeframeMore info
There are no current works notifications.

Please contact us if you need help with reading these documents, or if English is your second language. Call 131 450. This is a free service.

Below is a list of the completed works notifications for the Narrabri to North Star section of Inland Rail.

 

TownWorksLocationTimeframeMore info
Skinners CreekGeotechnical investigationsSkinners Creek13-23 October 2025Read more [PDF 200 KB]
MoreeUtility investigations and surveyTapscott Road to Camurrafrom 26 May 2025Read more [PDF 345 kB]
CroobleLevel crossing worksAlma Lane23 June - 2 July 2025Read more [PDF 126 KB]
PallamallawaLevel crossing worksWongabindie Road23 June - 2 July 2025Read more [PDF 206 KB]
YamboonLevel crossing worksCrooble Road23 June - 2 July 2025Read more [PDF 183 KB]
Croppa CreekLevel crossing worksCroppa Moree Road11-13 Jun 2025Read more (PDF 144kB)
CroobleLevel crossing worksAlma Lane27 May - 3 June 2025Read more (PDF)
CroobleLevel crossing worksCrooble Road27 May - 3 June 2025Read more (PDF)
CroobleLevel crossing worksGil Gil Creek Road27 May - 3 June 2025Read more (PDF)
PallamallawaLevel crossing worksCalimpa Road27 May - 3 June 2025Read more (PDF)
PallamallawaLevel crossing worksCounty Boundary Road27 May - 3 June 2025Read more (PDF)
YamboonLevel crossing worksCrooble Road27 May - 3 June 2025Read more (PDF)
BellataLevel crossing worksMillie Road17-20 May 2025Read More
BellataLevel crossing worksOld Newell Highway17-20 May 2025Read More
BellataLevel crossing worksSportsground entry17-20 May 2025Read More
BellataLevel crossing worksTen Mile Lane17-20 May 2025Read More
BellataLevel crossing worksTremayne property entry17-20 May 2025Read More
GurleyLevel crossing worksGurley Settlers Road17-20 May 2025Read More
GurleyLevel crossing worksPenneys Road17-20 May 2025Read More
Croppa CreekLevel crossing worksBuckie Rd29 April - 7 May 2025Read More
North StarLevel crossing worksBoonery Park Rd29 April - 7 May 2025Read More
North StarLevel crossing worksCroppa Creek Rd29 April - 7 May 2025Read More
North StarLevel crossing worksNorth Star Rd29 April - 7 May 2025Read More
North StarLevel crossing worksTumba Rd29 April - 7 May 2025Read More

View more

Talk to the Inland Rail team

If you would like to contact Inland Rail’s Narromine to Narrabri team, you can either call, send an email or visit one of our offices. We also hold regular events across the region, and you’re welcome to subscribe to our enewsletter.

Phone1800 732 761 during business hours or leave a message and we'll get back to you.
Emailinlandrailnsw@inlandrail.com.au
MailInland Rail Pty Ltd, 85 Maitland Street, Narrabri NSW 2390
Visit85 Maitland Street, Narrabri, Monday to Friday, 9am to 4pm

Subscribe to e-news

 

Alternatively, you can fill out the below form, and request a team member to contact you: 

  • This field is for validation purposes and should be left unchanged.