Out-of-hours site investigations, Illabo to Stockinbingal 3 – 4 May 2025

Inland Rail contractors will undertake site investigation work as part of an ARTC track possession to assist with the delivery of the Illabo to Stockinbingal project.

Snapshot

Date

03 May 2025 - 04 May 2025

Working hours

7am-6pm, Saturday and Sunday

Location

Between Illabo and Stockinbingal

Town
  • Illabo
Local Government Area
  • Junee Shire Council

Work being done

The site investigations are required to provide essential information to assist with planning. Inland Rail’s contractor, John Holland, will undertake work as part of these investigations including survey, utility and geotechnical (excavation and drilling) investigations.

Activities will include:

  • Surveying the track and property boundaries including operation of drones
  • Underground and overhead utility locating and mapping using non-destructive digging (NDD)
  • Geotechnical investigation works including drilling and soil sampling
  • Environmental investigations through inspection and monitoring activities
  • Establishment of temporary site facilities to support works

What can I expect?

  • Vehicles entering and exiting the temporary site facilities between 6am and 7pm throughout the track possession with works to occur between 7am and 6pm
  • Heavy vehicle movements, earth-moving activities and on-track works
  • Traffic management may be required in some locations during possession hours. Please observe all traffic management instructions and signage.
  • Nearby residents may hear some noise during these works and can expect some additional construction workers and vehicles in the area.

Machinery used

Excavators, drill rigs, small truck mounted drill rig, NDD truck, water carts and support vehicles. Workers may be using hand tools and survey equipment including operation of drones, traffic management equipment and signage.

How we're managing impacts

  • Traffic management and reduced road speeds
  • Environmental controls in place
  • Access to private properties will be maintained
  • Temporary fencing around excavation sites

Contact

For any concerns or enquiries phone 1800 732 761 or email inlandrailnsw@inlandrail.com.au

Thank you for your patience and cooperation while we carry out these works.

Work locations

Work will occur within the rail corridor at Illabo as shown below in blue.

*Please note that locations are indicative and may change slightly. Not to scale.

Map showing location of site investigations near Illabo
Illabo - access via Warrens Lane, Olympic Highway, and private property in discussion with Landowners