Works notifications and environmental investigations
Inland Rail’s Narromine to Narrabri section is part of the 1,600km fast freight rail line that will connect Melbourne to Brisbane.
It is Inland Rail’s longest section of track and will involve constructing 306km of brand new rail corridor.
To help us plan, design and construct Inland Rail, we complete extensive field studies and site investigations to understand relevant environmental features, technical challenges and opportunities. This also ensures our regulatory requirements are met by minimising and adequately mitigating impacts to the environment.
Our work is not possible without the continued support and proactive collaboration from alignment landowners. We appreciate and value their commitment to progressing Inland Rail in the central west.
Environmental investigations include:
- geotechnical and ecological surveys – to gather information about soil, ecological habitats and communities
- hydrology studies – to examine historical and predicted flooding and surface water movements
- noise, air quality and vibration surveys – to measure current levels at key project sites and assess the operational levels across the entire alignment
- surface water and groundwater baseline studies
- utility identification surveys – to identify infrastructure such as electrical, gas and water pipelines
- traffic surveys – to establish existing vehicle class, movements and volumes on local roads and highways
- land and heritage surveys – to identify property boundaries and investigate any evidence of Aboriginal and non-Aboriginal artefacts and heritage.
Narromine to Narrabri works notifications
Below is a list of current works notifications for the Narromine to Narrabri section of Inland Rail.
| Town | Works | Location | Timeframe | More info |
|---|---|---|---|---|
| No current works notices |
Please contact us if you need help with reading these documents, or if English is your second language. Call 131 450. This is a free service.
The table below displays recently completed works for the Narromine to Narrabri section of Inland Rail.
| Town | Works | Location | Timeframe | More info |
|---|---|---|---|---|
| Narromine, Gilgandra, Baradine | Utility investigations | Various locations along the Inland Rail Corridor between Narromine and Baradine | 24 March - May 2025 | Read more |
| Baradine, Narrabri | Borrow pit investigations | Various locations | 17 March - 29 April 2025 | Read more |
Talk to the Inland Rail team
If you would like to contact Inland Rail’s Narromine to Narrabri team, you can either call, send an email or visit one of our offices. We also hold regular events across the region, and you’re welcome to subscribe to our enewsletter.
| Phone | 1800 732 761 during business hours or leave a message and we'll get back to you. |
| inlandrailnsw@inlandrail.com.au | |
| Inland Rail Pty Ltd, 85 Maitland Street, Narrabri NSW 2390 | |
| Visit | 85 Maitland Street, Narrabri, Monday to Friday, 9am to 4pm |
Alternatively, you can fill out the below form, and request a team member to contact you: