Ground investigation and survey works, Short Street, Broadford 20 June – mid-August 2024

Specialist contractors will be undertaking site survey and investigation works at various locations along Short Street, Rupert Street, Catherine Court, Sutherland Street and within the nearby rail corridor.

Map of works area, as described in the article

Snapshot

Date

20 June 2024 - August 2024

Working hours

7am-6pm Monday to Friday

7am-1pm Saturdays

Overnight low impact works in the rail corridor between Sunday 30 June and Wednesday 3 July, 9pm-5am

Location

Short Street, Broadford

Town
  • Broadford
Local Government Area
  • Mitchell Shire Council

Work being done

Specialist contractors will be undertaking site survey and investigation works at various locations along Short Street, Rupert Street, Catherine Court, Sutherland Street and within the nearby rail corridor.

Activities will include:

  • Establishing a temporary site office near Broadford trainstation
  • Undertaking a survey of the ARTC railway track, road andpavement levels at multiple locations using handheldequipment. Surveys will also be required at a smallnumber of private properties. Impacted property ownerswill be contacted regarding access prior to these workscommencing
  • Locating and mapping underground services using non-destructive digging (NDD)
  • Borehole drilling using a small truck mounted drill rig totake soil samples for testing and assessment. Once theworks are complete at each location the hole will be filled
  • Establishing a groundwater well on Short Street. Thisinvolves drilling into the ground, installing a narrow pipeand fixing a cover to allow access as required
  • Overnight works involving surveying the V/Line track while trains are not running. Workers will use handheld tools and equipment within the rail corridor. Workers will access the rail corridor at Broadford train station and via Jamieson Street.

During this time pedestrians and motorists are asked to take care and observe all traffic management instructions and signage.

Location of works

Low impact survey works will take place at various locations along Short Street, Rupert Street, Catherine Court, Sutherland Street and within the nearby rail corridor.

Non-destructive digging (NDD), groundwater well and borehole drilling works will take place at locations along Short Street, Rupert Street, Sutherland Street and Catherine Court. Approximate site locations have been marked in the below map. Locations may change or additional sites may be required at times.

Map of works area, as described in the article

What can I expect?

  • Works 7am-6pm Monday to Friday and 7am-1pm Saturdays
  • Overnight low impact works in the rail corridor between Sunday 30 June and Wednesday 3 July, 9pm-5am
  • Traffic management, including a short period (up-to a week) where temporary traffic lights and shuttle flow over the Short Street bridge will be in place
  • Reduced speed limits of 40km/h near works
  • Workers using machinery, equipment, hand tools and service vehicles operating at each site
  • The drilling process will create small holes in the ground which will be filled in at the completion of the works
  • Nearby residents can expect some noise during daylight hours and some additional construction workers and vehicles in the area
  • The groundwater well on Short Street will require regular monitoring and traffic management will be in place during these times.

Cancellation of works

Works can sometimes be cancelled at short notice depending on weather and other factors. Should this occur, works will be rescheduled.

Machinery used

Small truck mounted drill rig, non-destructive digging vehicle, support vehicles, workers using hand tools and survey equipment, traffic management equipment and signage.

How we’re managing impacts

  • Traffic management and reduced road speeds
  • Environmental controls in place
  • Access to private properties will not be impacted.

Contact

Phone: 1800 732 761

Email: inlandrailvic@inlandrail.com.au

Post: 39 Bakehouse Road, Kensington VIC 3031

Thank you for your patience and cooperation while we carry out these works.


Share: