The Albury to Illabo section of Inland Rail includes enhancements along approximately 185km of existing rail corridor from the Victoria-NSW border to Illabo in regional New South Wales.

While we will use the existing rail line, we need to make enhancements and modifications to provide sufficient height and width to support the safe running of double-stacked freight trains.

Works will include enhancements to:

  • rail tracks
  • footbridges and road bridges
  • overhead structures
  • signal structures
  • level crossings.

The Albury to Illabo project is now in the ‘detailed design, early works and construction‘ stage.

In June 2023, Inland Rail appointed Martinus Rail to design and construct enhancement works on the Albury to Illabo and Stockinbingal to Parkes sections of Inland Rail.

Snapshot

Type

Track enhancement

Length

185km

Anticipated works

Modifying existing structures to support transport of double-stacked freight trains

Status

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6

Project map

Enhancement works will take place on the existing track from Albury-Wodonga to Illabo. This track passes through the towns of Albury, Culcairn , Henty, Yerong Creek, The Rock, Uranquinty, Wagga Wagga and Junee.

 

Download map

Interactive map

Enhancement works will take place on the existing track from Albury-Wodonga to Illabo. This track passes through the towns of Albury, Culcairn , Henty, Yerong Creek, The Rock, Uranquinty, Wagga Wagga and Junee.

 